change panel No.
Posted: Mon Oct 27, 2014 4:04 am
project have 15 typical building and panel
We start with building 15 as first panel etc... Till panel 3 building no. 13
Finish all massage programming every thing in those 3 building
But now I need to make panel 1 building 1 etc....
I have a hitch it is easy but need little help
1- make export for existing project.
2- rensalise all loops.
3- read loops again.
4- open the old project with deferent reversion and open the massage database and copy all columns to the new database.
Now how can I do the second part of step 4 ?
We start with building 15 as first panel etc... Till panel 3 building no. 13
Finish all massage programming every thing in those 3 building
But now I need to make panel 1 building 1 etc....
I have a hitch it is easy but need little help
1- make export for existing project.
2- rensalise all loops.
3- read loops again.
4- open the old project with deferent reversion and open the massage database and copy all columns to the new database.
Now how can I do the second part of step 4 ?