project have 15 typical building and panel
We start with building 15 as first panel etc... Till panel 3 building no. 13
Finish all massage programming every thing in those 3 building
But now I need to make panel 1 building 1 etc....
I have a hitch it is easy but need little help
1- make export for existing project.
2- rensalise all loops.
3- read loops again.
4- open the old project with deferent reversion and open the massage database and copy all columns to the new database.
Now how can I do the second part of step 4 ?
change panel No.
Re: change panel No.
hi,
I had experienced this case three years ago,but I had to rebuild the project(canel the panel number 1 and make a new one);
the way I did it ti do it with MS excel;
run a report of the signature loop series,save it on htm format, open on any broswer you want,select all ,copy and past on an excel sprdsheet,
then from the excel you will copy and paste on the SDU by panel config,
if SO have another way ,you are welcome.
I had experienced this case three years ago,but I had to rebuild the project(canel the panel number 1 and make a new one);
the way I did it ti do it with MS excel;
run a report of the signature loop series,save it on htm format, open on any broswer you want,select all ,copy and past on an excel sprdsheet,
then from the excel you will copy and paste on the SDU by panel config,
if SO have another way ,you are welcome.
-
- Posts: 15
- Joined: Fri Dec 14, 2012 5:15 pm
Re: change panel No.
Its time taking and fails sometimes. Use the object.db to do it. Make sure to backup it up.. :)